Overview
Both plant and harvest dates can be assigned to fields within FarmQA Controller. This can be done from either the map or list view. Once entered dates will appear on scouting reports, and can be filtered on within the list view to see what order fields were planted or harvested. See the instructions below on how dates can be assigned
Map View Date Input
- Login to FarmQA Controller
- Click on the "Map" tab
- Next select the field you wish to add a date to, and select the "plant" or "harvest" icon from the field details pane (see below).
- To update a plant or harvest date, simply click on the field and enter a new date
List View Date Input
- Login to FarmQA Controller
- Click on the "Fields" tab
- Next select the field you wish to add a date to by using the check box on the left side of the field name. Then click the "plant" or "harvest" icon in the top right-hand corner. (see below)
- NOTE: You can assign the same plant or harvest date to multiple fields by using the multi-select feature.
- To update a plant or harvest date, simply click on the field and enter a new date
NOTE: if you have a perennial crop you can enter multiple harvest dates by having the "perennial flag" turned on within Settings->Crops. See this article for more details.
- If you have multiple harvest dates we will show the latest harvest date in the field list view.
Please contact FarmQA Support with any further questions
support@FarmQA.com |
FarmQA.com |
701-365-4894 |
Comments
0 comments
Please sign in to leave a comment.