Prepare For Success This Season with This Check List Video
The Comm Tower (CT)
Make sure it is fully charged. Either set in the sun for at least 2 hours before installation, or use wall charger until indicator light turns green.
The System
Test the parts together and make sure everything works before heading out to the field. To do this, connect the probe to the comm tower, insert the jumper plug, and listen for the appropriate beeps. The video provides further instructions if needed.
The Probe
Check for cable damage and clean the connection ports. Look for any cracks in the physical probe.
Comments
0 comments
Please sign in to leave a comment.